top of page

METHODIST SMITH TOWER – LEVEL 8 RENOVATION

HOUSTON, TX

Client

Contractor

Size

Completion

Delivery Method

Methodist Hospital

The Trevino Group

3,500 s

March 2019

Design-Build

In need of renovation, the existing office suite, elevator lobby and common corridors were modernized by providing new lighting, flooring, wall finishes, millwork and open collaboration areas / dining areas. The oversized conference room was divided to provide additional seating in the break room and the under-utilized copy area was converted into collaborative seating areas.

  • facebook
  • linkedin
logo_logomark_no_background.png

©2019 by Precision Architecture, Inc.

main  //  832-504-1430

Houston  //  Pearland

bottom of page